Through e-mail
PAKISTAN HOSIERY
MANUFACTURERS & EXPORTERS ASSOCIATION
PHMA House, 37-H,
Block-6, P.E.C.H.S, Karachi. Tel: 0092-21-34522769, 34522685, 34544765
Fax: 0092-21-34543774,
E-mail: info@phmaonline.com
Ref. No.
PHMA/Cir-008/2019
Dated: 28th January, 2019
To: All Members of the Association
(Southern Zone & Northern Zone)
INDUSTRIES TO ENSURE APPROPRIATE AXLE LOAD CONTROL / LADEN WEIGHT FOR
TRANSPORTATION OF THEIR GOODS BY VEHICLES / TRUCKS / TRAILERS SO THAT THE
OVERLOADED HEAVY VEHICLES SHOULD NOT DAMAGE THE MOTORWAYS AND HIGHWAYS
Mr. Muhammad
Hussain Shah, Director (Construction) Karachi, National Highway Authority
called on Mr. Muhammad Jawed Bilwani, Coordinator, Karachi Industrial Forum
(KIF) & Central Chairman, PHMA on Thursday, 24th January, 2019 at PHMA
Office Karachi and apprised that the National Highway Authority under the ambit
of Federal Ministry of Communication is making efforts to ensure heavy vehicles
should carry approved weight only to avoid damages to roads. In this
connection, NHA is approaching the Associations to request the member
industries to restrict their transporters to transport their goods to up or
down country routes via heavy vehicles as per approved and permissible laden
weight to ensure compliance to Governments policy. (Details attached)
The NHA
Official informed that the heavy vehicles due to over loading and exceeding
load beyond approved laden weights has been damaging the highways and
motorways, particularly a lane of Karachi Hyderabad Motorway (M-9) has also
damaged because of overloaded heavy vehicles and requested PHMA to advise the member
industries to restrict their transporters to ensure compliance, accordingly.
Mr. Jawed
Bilwani stressed upon the need to divert maximum load of goods carried in
containers for transportation on railways to reduce the flow of heavy traffic
in Karachi City and elsewhere on other upcountry destinations. He stated that
the Government's approved goods carrying weight for heavy vehicles shall be
shared with members for compliance of load / weight management. He urged the
Highway Authority to reduce the toll (which was increased by the Government
after renaming the N-5 Karachi to Hyderabad as Motorway M-9 after completion).
He also urged that the heavy vehicles weight plying to upcountry should also be
checked at the NHA Weighbridges before allowing vehicles to Motorways /
Highways. He also gave suggestions to NHA for improvement of traffic flow at
Lyari Expressway while introducing express e-passes to avoid long queues at the
entry points. He also urged NHA to improve traffic flow while removing the
bottleneck at the entry point of M-10 near ICI Bridge and repairing the
expansion joints on two bridges over Lyari River at M-10. He also emphasized
that the Southern Bypass should also be constructed in the national interest
and the lanes of Northern bypass should also be doubled. He was also of the
view that the Government should also consider to construct elevated link roads
to connect the Karachi Ports (Container Terminals - KICT, PICT and SAPT) direct
with the Highways and Motorways because currently all the gates of the Ports /
Terminals open within the city due to which the heavy traffic cause severe
congestion and traffic deadlocks.
Thanks & Best Regards,
Khadim Rasool
Secretary General
|
PAKISTAN HOSIERY MANUFACTURERS & EXPORTERS ASSOCIATION (PHMA)
Central Office: PHMA House, 37-H, Block-6,
P.E.C.H.S., Karachi-74500, Pakistan
+92-21-34544765
+92-21-34544764 / 34545683
+92-21-34543774
+92-309-3337462
Offices:
Karachi |
Faisalabad |
Lahore |
Sialkot
🌱 Please consider the environment before printing this circular. DISCLAIMER: This message may contain confidential or legally privileged material and may not be copied, redistributed or published (in whole or in part) without prior written consent of the Pakistan Hosiery Manufacturers & Exporters Association (PHMA). If this communication has been intercepted, delayed, corrupted, incomplete or contains any virus, PHMA accepts no liability arising therefrom. The contents of this communication are subject to change without prior notice. |